About the Project
We carried out a package of finishing and metal works on the project: grade 304 stainless-steel handrails for the stairs and walkways, pergolas and decorative screens for the courtyard, cladding for the structural columns and WPC doors, along with aluminum work covering a curtain wall and push-out windows. The work was completed in 45 days.
Our Scope of Work
- Grade 304 stainless-steel handrails
- Pergolas and decorative screens for the courtyard
- Cladding for the structural columns
- WPC doors
- Aluminum work: curtain wall
- Push-out aluminum windows
Materials & Finishes
- Grade 304 stainless steel
- WPC (wood-plastic composite)