ResidentialAluminum Works

Al Azariyah Kitchens

Aluminum kitchens supplied and installed for a residential project on Arafat Road near Al Batha, Riyadh: 2.5 mm profiles, double-fiber doors with concealed handles, and a black marble worktop with a stainless-steel sink.

Riyadh July 2026
Client
Private client
Location
Arafat Road, near Al Batha, Riyadh
Date
July 2026
Status
Completed
Sector
Residential
Duration
45 days

About the Project

We supplied and installed the aluminum kitchens for the Al Azariyah residential project on Arafat Road near Al Batha, Riyadh, in 45 days. The kitchens were made in our factory from 2.5 mm aluminum profiles and installed on site by our own team.

The aluminum frames are joined at spearhead corners with concealed three-way connectors. The doors are double fiber: two 2 mm layers, front and back, on Italian-type hinges that resist rust and water, with concealed built-in handles along their top or bottom edge. Inside, the shelves are laid out to the client's request.

The base units stand on 2 × 8 tube sections and carry a black marble worktop, cut out for a 40 × 45 cm rust-proof stainless-steel sink fixed to the base unit. The kitchens also include a drawer unit with rust- and water-resistant stainless-steel fittings.

Our Scope of Work

  • Supply and installation of aluminum kitchens in 2.5 mm profiles
  • Aluminum joined at spearhead corners with concealed three-way connectors
  • Double-fiber doors: two 2 mm layers, front and back
  • Italian-type hinges, rust- and water-resistant
  • Concealed built-in handles on the top or bottom edge of the doors
  • Interior shelves to the client's request
  • Base units mounted on 2 × 8 tube sections
  • Black marble worktop with a cut-out for a 40 × 45 cm rust-proof stainless-steel sink
  • Drawer unit with rust- and water-resistant stainless-steel fittings

Materials & Finishes

  • 2.5 mm aluminum profiles
  • 2 mm double-fiber panels
  • Black marble
  • Rust-proof stainless steel
  • Italian-type hinges

Services

Challenge

Making aluminum kitchens that stand up to water and humidity, with a clean, handle-free look, and installing them on site within 45 days.

Solution

We made the frames and doors in our Riyadh factory and chose rust- and water-resistant hinges, fittings and sink; our own team then installed everything on site with the marble worktop.

Result

The kitchens were handed over ready for use in July 2026.

5 photos

Project Photos

Our team fitting the wall cabinets
Photo 1 of 5Our team fitting the wall cabinets