ResidentialAluminum WorksMetal & Iron WorksGlass Works

Wasl 20 Olaya

Aluminum, steel, cantilevered metal stair and glass work for the Wasl 20 residential compound in Olaya, Riyadh, for Details Real Estate Development, delivered in six months.

Riyadh December 2025
Client
Details Real Estate Development
Details Real Estate Development Co.
Location
Olaya, Riyadh
Date
December 2025
Status
Completed
Sector
Residential
Duration
6 months
Main contractor
Wajhat Al Arabia Contracting Co.

About the Project

For Details Real Estate Development, we carried out the aluminum and steel work on Wasl 20, a residential compound in Olaya, Riyadh, under the main contract held by Wajhat Al Arabia Contracting Co. The work took six months, and the project was handed over in December 2025.

Our scope covered aluminum windows and doors with double-glazed tempered glass, the main steel doors, steel doors for the drivers' rooms and storerooms, steel pergolas and screens, and the decorative perforated, laser-cut screens that mark the villas' facades.

Inside the villas, we built the cantilevered metal stair structures and fitted 12 mm tempered-glass handrails and shower screens. The work was made in our Riyadh factory and installed on site by our own team.

Our Scope of Work

  • Aluminum windows and doors with double-glazed tempered glass
  • Main steel doors
  • Steel doors for drivers' rooms and storerooms
  • Steel pergolas and screens
  • Decorative perforated, laser-cut screens
  • Cantilevered metal stair structures
  • 12 mm tempered-glass handrails and shower screens

Materials & Finishes

  • Double-glazed tempered glass
  • 12 mm tempered glass
  • Aluminum profiles
  • Steel

Services

Challenge

Delivering a full package of aluminum, steel and glass work across a large number of repeated villas in six months, with decorative facades that had to match from one villa to the next.

Solution

We made the windows, doors, screens and stairs in our Riyadh factory to consistent measurements, and coordinated with the main contractor so our own team could install them on site villa by villa.

Result

The project was handed over in December 2025, within the six-month program.

8 photos

Project Photos

The compound from above
Photo 1 of 8The compound from above

Planning a similar project?

Send us your project details and our team will contact you to arrange a site visit and a quote.

Projects

Similar Projects

All Projects →